Artikel   =>  77-78/84-85 Abschlussbericht 2010

77-78/84-85 Abschlussbericht 2010

1.1. Area 3 Final report

General information

Supervisor:
Jacob Eerbeek (Amsterdam)
Assistant:
Yiğitcan Hosafci (Ankara) (until 22-08-2010)

Excavation (date):
27-07-2010 through 25-08-2010

Local workers (most common team composition): 
Ibrahim Öksüz
Resul Kaya
Mehmet Kaymak
Muradiye Yüksel
Serhet Ediz
Satu Kaya
 

 

 
 
1.1. Area 3 Final report
 
1.2. Introduction (location, history and research objectives)
 
1.3. General remarks (square 7784, 7785, 7884 and 7885)
 
1.4. Architecture
 
1.4.1. Architecture: the external face of the gate-tower building complex
 
1.4.2. Architecture: the southwest tower-room
 
1.4.3. A comparison with the King's Gate at Boğazköy-Hattusa
 
1.5.1. Find complex floor Locus:7784:016
 
1.5.2. Floor deposit
 
1.6. Area outside tower-building
 
1.7. General stratigraphy and ceramic dates
 
1.8. Additional finds
 
1.9. Future research
 
 
Kategorie
Reports 2010
Angelegt von
Jacob Eerbeek
Anlage
26.08.2010 06:45
letzte Änderung
14.09.2010 07:16
durch
Jacob Eerbeek
   
 

 

 

© Oymaagac-Nerik-Forschungsprojekt 2005 - 2018      |      erstellt von datalino 2008 - 2018      |      Kontakt      |      Impressum