Top of tunnel fill, with lots of pottery, bones and burnt mud-brick. brownish soil. lost of snail remains.
Work stopped by a second 10 o’clock power cut.
This lasted till 15.00 hours. In the afternoon Theo and some students set up the Total Station and the administrative border between squares 7886 and 7986 was marked in the tunnel by red and white band and a pencil mark on the stone on the right side of the central keystone.
After the return of power some limited digging took place.